UDOT reduces Redwood Road congestion with innovative continuous flow intersection

0

The Utah Department of Transportation (UDOT) has implemented a continuous flow intersection (CFI) on Redwood Road at Pioneer Crossing. The CFI is designed to significantly reduce wait times for vehicles wishing to turn left or right.

Share this story:

About Author

mm

Rachelle joined Traffic Technology International in early 2016 after having worked for an HR magazine and prior to that, as a freelance sub editor for various lifestyle consumer magazines. As deputy editor, she supports the editor in making each issue and updating the website. Outside of work, she enjoys tap dancing, playing the piano and video games, and eating spicy food.